Untreated wastewater from sewage plant in Kozhikode flows into Canoli canal

Chevayur Medical College's sewage treatment plant operates at half capacity using temporary staff because overdue electrodes remain unreplaced since 2024, causing insufficiently treated wastewater to be discharged into the Canoli Canal.
Read the full report on Onmanorama
Story file
- Section
- India
- Places
- Kerala
- First reported by
- Onmanorama
- Reporter
- our correspondent
- Published
- Sunday, 11 October 2026, 12:29 pm IST
- Coverage
- One outlet so far
How this page works. The Headline Update lists this report from Onmanorama with a short summary and a link to the original. The original reporting and photograph belong to the publisher. Spotted an error in our summary? Tell our corrections desk.

