Juniper Green Energy commissions 150 MW wind-solar hybrid project in Gujarat

Juniper Green Energy has commissioned the final 5 MW turbine at its Gujarat wind-solar hybrid project, taking its operational capacity to around 2,745 MWp, alongside 603 MWh of battery storage.
Read the full report on Cnbctv18
Story file
How this page works. The Headline Update lists this report from Cnbctv18 with a short summary and a link to the original. The original reporting and photograph belong to the publisher. Spotted an error in our summary? Tell our corrections desk.


