FIR lodged against contractor for shoddy bridge work

FIR filed in Narmada district against Royal Infra Engineering over alleged shoddy Karjan river bridge work; bridge declared unsafe and traffic suspended.
Read the full report on The Times Of India
Story file
- Section
- Health
- Topics
- Crime & safety
- First reported by
- The Times Of India
- Reporter
- times news network
- Published
- Monday, 19 October 2026, 12:28 am IST
- Coverage
- One outlet so far
How this page works. The Headline Update lists this report from The Times Of India with a short summary and a link to the original. The original reporting and photograph belong to the publisher. Spotted an error in our summary? Tell our corrections desk.


